Survey of Shanghai Bridge using APACHE6 USV with NORBIT iWBMS STX Multibeam Echosounder.
The Donghai Bridge, located in Shanghai, China, is a key component of the Shanghai International Shipping Center’s deepwater port infrastructure. Conducting underwater surveys of the bridge piers’ conditions for maintenance purposes is an operational challenge. The bottom of the bridge piers is immersed in water and can be eroded by the action of sand and gravel. Hydrodynamic scour caused by rapid water flow can create scour holes and compromise the integrity of the structure.
The full article was Written by Taxiya Wang from CHCNAV.
The article was published in Sea Technology Magazine in June 2022.
Case Study: Single-Pass Bank-to-Bank Survey of China’s Deepest River Channel
The Qing River (清江), a major tributary of the Yangtze, has been dramatically…
New video: Exploring the Ocius Bluebottle USV with NORBIT and Seismic Asia Pacific
Come with NORBIT Subsea and our Australia sales partner, Seismic Asia Pacific in…
NORBIT Technical Seminar in the Middle East – December 10-11th, 2025 Dubai, UAE
In partnership with Ashtead Technology, we are thrilled to invite you to the…